Skip to content
Metro City Moves

Removal quotes explained: fixed price, estimate, and the extras

Facts checked 12 October 2026Costs and charges

Daniel, founder of Metro City MovesWritten by Daniel, founder, Metro City Moves

Council and TfL figures on this page are the authorities' own charges, read from their websites on the dates listed under Sources. Fees change — most councils revise theirs each April — so check the authority's page, or ask us, before relying on any figure.

A removal quote is usually a single page, and most of the words on it are doing considerably more work than they appear to. Here are removal quotes explained from the reader's side: what the number actually promises, which later changes are legitimate, and which are not. What sets the figure in the first place is a separate subject, covered in our London removals cost guide. Begin with the word at the top of the document, because a quotation and an estimate are different commitments.

The short version

Quotation
a fixed price offered for acceptance. Accept it, and that is the price.
Estimate
a considered guess, which can legitimately move afterwards.
Fair changes
more to carry, different access, a second address, a premium date, waiting time.
Not fair
a firm that underpriced its own hours, or stayed silent until the van was loaded.
Public charges
council and TfL fees are not the remover's money and belong on their own line.
Cover
the document should name what is covered if something is damaged, and what is excluded.

Quotation or estimate

The two words are not interchangeable, and the difference determines what happens if the final bill arrives higher than the figure you were shown.

A quotation is a price offered for acceptance. Business guidance from nibusinessinfo states it plainly: a quotation is a fixed price offer that cannot be changed once the customer has accepted it. The trader is expected to hold that price even if the job takes longer than anticipated.

An estimate is a considered guess at what the work will cost. Citizens Advice describes it as the trader's best guess. You have less protection than under a quotation, so the eventual bill can legitimately be higher.

The practical consequence also sits in the Citizens Advice wording. Where you hold a quotation, the trader cannot charge more than the quoted figure unless there is a good reason. The examples given are additional work you agreed to pay for, or a price that was obviously a mistake. Their own costs increasing is not one of those reasons.

The heading on the paperwork is not the test. A document titled "estimate" that names a crew, a van and a single total remains an estimate. One titled "quotation" that also names its own exceptions is a quotation, and a careful one. Read the sentences surrounding the number rather than the word above it.

Settle the quotation-or-estimate question in writing

It is the one ambiguity nobody can resolve afterwards from memory, and it governs everything else on the document.

Why a price can legitimately change

Not every revision is sharp practice. Five reasons are entirely ordinary, and a carefully written quote identifies them before you accept it.

  • The inventory grew: a survey prices what it was shown, so a loft, a shed, a garage or a second wardrobe discovered afterwards is additional carrying and additional loading.
  • Access turned out different: a first-floor flat with a working lift is not the same day's work as a second-floor walk-up. Nor is a goods lift that has to be booked, or a van that cannot get within fifty metres of the door.
  • A second address appeared: a detour to a storage unit or a relative's garage means another load, another parking problem and another carry.
  • The date moved into a premium slot: the final working days of the month, Fridays and bank holidays are the dates everybody wants, and they are priced accordingly.
  • Waiting at a delayed completion: keys arriving late is nobody's fault, and a loaded crew standing in the street is still a crew being paid.

What makes any of those legitimate is the sequence: the firm identifies what has changed and what it costs, you agree, and then the work happens. A charge appearing for the first time on the invoice has skipped the middle step entirely.

Something visible at the survey is not a change

If the surveyor stood in the room and counted the boxes, the box count cannot become a surprise on moving day.

Why a price should not change

Three reasons are not yours to carry.

  • The firm underestimated: getting the hours wrong is a pricing error rather than additional work.
  • The crew was too small: crew size was the firm's own decision, taken after it had seen the job.
  • It was never mentioned: a charge that existed all along and surfaced once the van was loaded is not a change in circumstances. It is a term that belonged on the original document.

That is the shape of the Citizens Advice position as well. A good reason means work you agreed to, or an obvious error in the figure. It never means a shortfall at the firm's own end.

Charges collected on your behalf

Several lines on a London removals bill were never the remover's money. A parking bay suspension is a council charge, and so is a dispensation where the council sells no suspension. The Congestion Charge and ULEZ belong to Transport for London. The firm pays them so the van can stand and travel legally, then passes them on.

Two things make that readable: they occupy their own lines rather than disappearing inside the labour figure, and they are passed on at cost. Combined into a single total they become invisible.

No amounts appear here, because they change and they differ by borough. The per-borough suspension fees are in our parking suspensions guide, and the difference between the two permissions is in suspension or dispensation. The vehicle charges are in ULEZ and removals. Each of those pages carries the date it was last read.

Removal quotes explained, line by line

Work down your own document and tick these off. A missing line proves nothing in itself. It is a question you have not been given the answer to.

  • Crew size: how many people, stated as a number.
  • The vehicle: which van, and whether the job is one load or two.
  • The date and the arrival window: a date with no time attached is half a booking.
  • Expected duration: how long the firm believes it will take, which tells you what a fixed price is assuming.
  • Fixed or hourly: in those words, not implied by the layout.
  • What is included: packing, materials, dismantling and rebuilding, floor and doorframe protection.
  • What is excluded: named individually, rather than a gap where the naming should be.
  • Overrun: what happens if the day runs past the expected duration, and at what rate.
  • Public charges: which ones are passed on, and shown separately.
  • Cover: what is covered if something is damaged, what is excluded, and what you have to do to claim.
  • Payment and cancellation: when payment falls due, what a deposit secures, and the cancellation terms in writing.

A document answering all eleven is something you can plan a day around. Setting several quotes against one another is a different exercise, and our guide to comparing man and van quotes does that job.

Deposits and cancellation

A deposit is normal, and what matters is what it is attached to: a written quotation, written terms and a confirmed date. A deposit paid against a figure somebody mentioned on the telephone leaves you nothing to point at afterwards.

Cancellation is the part most people assume they understand, and it is the part worth reading twice. The Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013 cover contracts concluded at a distance — by telephone, email or website — and contracts concluded off-premises, which includes the one agreed at your kitchen table. Within those regulations, a service contract ordinarily carries a right to cancel without giving a reason, ending 14 days after the day the contract is entered into.

The same regulations also carve several things out of that right, and one of the exclusions names "the supply of accommodation, transport of goods, vehicle rental services, catering or services related to leisure activities, if the contract provides for a specific date or period of performance". A removal booked for a particular day is transport of goods on a specific date, so the exclusion may well cover it. We have not found a decided case or regulator guidance either way, and we are not going to tell you the point is settled when it is not.

So do not plan around an assumed statutory right. What reliably governs your booking is the cancellation wording in the firm's own terms: how long before the date you may cancel, what happens to a deposit, and what changes if you move the date rather than cancel. Ask for that in writing before you pay anything, from us or from anyone else. A firm that will not put its cancellation terms in writing has told you something useful.

How we quote

Our own model, so you can see where we sit against everything above.

We survey every job before quoting it, in person or on a video call. The quotation then arrives in writing, with the crew, the vehicle, and what is in and out of it. The number you accept is the number you pay. We are fully insured.

Sometimes the day is genuinely different from what we surveyed: a lift out of service, a second address, keys that do not arrive. We tell you what it changes and what it costs before we do it, and that is the only circumstance in which the figure moves. It works the same way across house removals, man and van and office removals, although an office move has a considerably longer list to agree.

Common questions

Is a removal quote binding once I accept it?

Treat it as the agreed price. Citizens Advice says a trader who gave a quotation cannot charge more without a good reason. The examples are additional work you agreed to pay for, or an obviously mistaken figure. Rising costs do not count.

My document says "estimate". Can the price go up?

Yes. An estimate is the firm's best guess rather than a fixed commitment, and you have less protection if the eventual bill is higher. If you want a figure that holds, ask for a written quotation with its exceptions named on it.

Can a removals firm charge more on moving day?

Only for a genuine change, and only with the sequence intact: they identify what has changed and what it costs, you agree, then the work happens. A charge first appearing on the invoice has skipped a step.

Should parking charges be in the quote?

They should be on it, on their own line, at cost. A suspension or dispensation is the council's fee, and ULEZ is Transport for London's. Combined into one total, you cannot separate the labour from the public charges.

Can I cancel after paying a deposit?

For a contract agreed at a distance or off-premises, the 2013 regulations allow 14 days after the day the contract is entered into. If you asked for the work to begin inside that window, you pay a proportionate amount for whatever was supplied.

What if completion is delayed and the crew is waiting?

It happens constantly in a London chain, and it costs real time. The quotation should state the point at which waiting time begins and the rate that applies. If yours is silent, that is the gap worth closing before booking.

Sources

  • Consumer Contracts (Information, Cancellation and Additional Charges) Regulations 2013, regulation 27, which applies Part 3 to distance and off-premises contracts — legislation.gov.uk, /uksi/2013/3134/regulation/27 (read 12 October 2026)
  • Regulation 29, the right to cancel without giving a reason — legislation.gov.uk, /uksi/2013/3134/regulation/29 (read 12 October 2026)
  • Regulation 30, the normal cancellation period; for a service contract it ends 14 days after the day the contract is entered into — legislation.gov.uk, /uksi/2013/3134/regulation/30 (read 12 October 2026)
  • Regulation 36, service begun inside the cancellation period, the express request and the proportionate payment — legislation.gov.uk, /uksi/2013/3134/regulation/36 (read 12 October 2026)
  • Citizens Advice, quotes and estimates, and when a trader may charge more than a quotation — citizensadvice.org.uk, /consumer/builders-and-home-improvements/problems-with-cost (read 12 October 2026)
  • nibusinessinfo.co.uk, the difference between a quotation and an estimate — nibusinessinfo.co.uk, /content/difference-between-quotation-and-estimate (read 12 October 2026)

Nothing on this page is legal advice. The regulations above set a floor; your own contract terms sit on top of it, and should be in writing before you pay anything.

Get a quote

Get it priced properly

A survey first, then the number in writing. Answered at any hour.

CallGet a quote